● Building Management System (BMS) controlled Air handling units.
● Modern water treatment plants- De-mineralized and Reverse osmosis plant.
   550 TR air conditioning system.
● 1250 KVA stand-by generators and 60 KVA UPS for continuous power supply
   for critical operations.
● 3 Ton Boilers, Pure Steam Generator, Water for Injection generator, WFI and
   HPW distribution loops with continuous recirculation.
● All utilities supplied to required areas through service pendants.
● Walkable false ceiling for manufacturing and testing areas for carrying
   out maintenance.